2nd run of the week, off to a great start! Headed for Ft. Myers, FL..then prob go visit extended family in Avon Park :+)
Dale
I have all the "stuff" to do it, just haven't yet. Yes you can have vacuum problems if you have any kind of leak letting air into the tank...so you have to make sure you have a good seal where you drop the pickup line in the tank. JB Weld and maybe even a silicone sealant around and over that.
If i wasn't so lazy, mine would be done, but it is what it is...lol...
Florida?.....there goes the rest of the week down the tubes......LOL
Lets just say..you are not with the Feds now....LOL...that said...this is expedite...ya never know where the next load will come from.....I mean YOU actually got a load out of Louisiana...you might be gifted.?....LOLYou sayin Florida hard to get out of? LoL..eh, hope not, but got a place to hang for a bit :+) hopefully not long tho.
Dale
At the tenneessean. Guido was that you heading north on I75 in Ohio last night?
Florida?.....there goes the rest of the week down the tubes......LOL
NEVER underestimate Load One dispatch!
I don't find any real big difference using workflow. Something takes maybe 30 seconds tops how big of problem can that be.
Oh lord do I really need to touch the screen again, my life is soooo hard. I'm just saying, really?
Have to make it easier for us low IQ drivers ya know....LOL
Good morning....it is I, John Elliott. The most loved and yet hated man in expedite.....
Ken, go easy on yourself there! lol....
Maybe I am just prematurely worrying about nothing based on speculation and opinion.I'll put it aside until I get the new program installed.I don't think I really have a choice in the matter to begin with...lol..
I know this is a traditional slow month, but I really would like something to do, as far as work goes....I could sand the floor and polyurethane it, but it would take at least 3 days to air out from the fumes...
Ken, go easy on yourself there! lol....
Maybe I am just prematurely worrying about nothing based on speculation and opinion.I'll put it aside until I get the new program installed.I don't think I really have a choice in the matter to begin with...lol..
I know this is a traditional slow month, but I really would like something to do, as far as work goes....I could sand the floor and polyurethane it, but it would take at least 3 days to air out from the fumes...