With my C9 on the down side of 700k mi.s, it's time to think about being proactive on replacement with the least amount of downtime. I'm hoping to get 1,000,000 out of it, but I realize I may be dreaming. Despite what others may think about this motor, I've been very pleased, runs smooth, pulls hard, decent mileage, doesn't leak a drop and I have learned to do most repairs and maintenance myself over the years including the overhead, water pump, and injectors (except setting the trim on the inj which I have a local Cat man do, no wait, that's a Bob Seger tune isn't it?)
With all the nightmare stories about shop incompetency, I am researching doing the switch myself. I think the Cat reman would be the way to go. Question is, will a 4,000 lb engine hoist like this one;
Beacon World Class Portable Jib Crane and Gantry Crane
be enough capacity, or does anyone have any other suggestions on a lift?? Unfortunately I don't have a large enough shade tree around the house, so that is out. Not a lot of info online to research this so I thought I'd throw it out there.
With all the nightmare stories about shop incompetency, I am researching doing the switch myself. I think the Cat reman would be the way to go. Question is, will a 4,000 lb engine hoist like this one;
Beacon World Class Portable Jib Crane and Gantry Crane
be enough capacity, or does anyone have any other suggestions on a lift?? Unfortunately I don't have a large enough shade tree around the house, so that is out. Not a lot of info online to research this so I thought I'd throw it out there.